Showing posts with label Dave. Show all posts
Showing posts with label Dave. Show all posts

29 July 2015

Press release

for general distribution


Family boatbuilding business association breaks up for good


Burlington, New Jersey
22 June 2015


After a long, productive history, John Cherubini, Jr., and Cherubini Yachts, LLC, of Delran, NJ, have severed all professional associations, sources close to both sides report.   John, Jr., whose father designed the landmark Cherubini 44 double-headsail ketch and Cherubini 48 staysail schooner, had worked with his cousin David’s business almost since its onset in 2003.

John, Jr.’s history with the original Cherubini Boat Company began at Burlington, NJ, in 1973, with the lofting and planking of the original Cherubini 44 plug with his father, John, Sr., brother Steve, uncle Frit (Leon), and cousin Lee.  This family group remained, in spirit and in substance, the nucleus of the boatbuilding concern that hand-built 42 boats through the 1990s.  John, Jr., worked in direct labor, production control, purchasing, sales support and marketing, payroll, and especially in design and component engineering, being responsible for devising custom-made deck hardware, tanks, and brackets that made the Cherubini 44 unique.  With Lee he designed the long-popular two-stateroom interior plan, giving the C44 a spacious galley and roomy head compartment at a time when such features were reserved for much larger yachts.

After his cousin David resurrected Cherubini boat production, John, Jr. served throughout the hierarchy of the business, variously as a contractor, direct employee, and encouraging friend.  Taking on his late father’s role, he worked closely with the staff on design and engineering issues to conservatively modernize the C44 design.

David, ten years younger than John, had not the hands-on experience nor the technical education that comes from growing up with a gifted yacht designer as a father.  ‘I had hoped that Dave would want to benefit from my expertise,’ says John.  But, amid family and professional differences, the two fell out for good in spring 2015 and John was constrained to remove his own Hunter 25, Diana, from his cousin’s yard where he was always so proud to have kept it.

John’s complete departure from Cherubini Yachts marks the finale of the surviving family core who began the business in 1975.  His brother Steve and cousins Lee, Rick, Brian, and Mike have all been, to one degree or another, rendered redundant as employees, contractors, vendors or associates of their family’s legacy, leaving David the sole Cherubini at Cherubini Yachts.

John, Jr.’s future in the boating industry remains uncertain.  He has declared an intention to offer reproductions of his family’s artwork, including drafting work by John, Sr., for consumer markets.  It is doubtful if any of the Cherubini 44 and 48, as designed by his father, will ever be built again.

 

- Cherubini Art & Nautical Design

* * *

15 November 2014

Moving day

24 October 2014


I have not been happy with the boat's being where it's been.  This is sort of the 'swamp' of the yard.  Well-- it is not really a swamp-- Diana has been sitting on good solid packed gravel-- but the ground immediately beside her is low and tends to fill up in any rain.  This, in addition to the constant mosquitoes, makes doing boat work after 4.00 pm and on weekends less than fun.  So I contracted the guys to relocate Diana to a drier, happier place, especially with regards to facing another (her last?) winter on land.

Here in the Northeast, when placing a boat for the winter season, it is best to situate her nose-into the weather.  This is better for the boat, for any covers, for the stowage of gear on deck and on the ground, for persons entering the boat in the off-season, and for a host of a million other reasons.  Diana, especially, with her low-profile deck and cabin, heads to weather very well-- but all my covers and the cockpit have taken a beating over these (too many) years sitting stern-to the weather, which here in Delran comes to us on a direct line from Philadelphia (bearing from W/SW) in summer and from W and NW in winter.  The compass in the bulkhead shows her facing E/SE.  Enough said.


This is Diana's old spot, in 'The Swamp'.  Here Jerry's C44 Second Alarm has been moved to his new spot and I was standing, for the first time in two years, where his boat had been.  Together these boats and the others in this photo weathered Superstorm Sandy and all the rest.



Now I know how these guys work.  The guys from Riverside Marina come over, back the hydraulic boat carrier to the front of your boat, and then-- wait for it-- remove all the stands.  I mean all of them but the very back and the very bow.  I've seen them do this even on windy days, with the rig up.  Yikes.

Watching them do this with a C44 or Ben's Rhodes Reliant (with that narrow transom!) is unnerving.  Watching them do it with my own boat is an automatic case of the heebie-jeebies.  I was so paranoid that I subtly replaced the stands in the very back with a pair a little closer forward, though they were not at any bulkhead, just to persuade them to leave those as the last two.  But they moved them back (to right where they were before), saying they couldn't get the truck under it.  I was near fits.


Then, to really bring on the stomach acid, the forward pads on the truck would not find the boat.  I've seen this thing in action many times but always thought that for smaller boats the pads would angle inwards.  Apparently, they don't.  The picture shows the back ones too far forward and too low, the front ones way too high, and the keel (read that: whole weight of the boat) on a 3-inch-wide strap spanned between the wheels of the truck thing.  Sheesh.

Meanwhile, between snapping photos (which I did not really do so much) I was worrying that the pads in front are pushing against the v-berth shelf, probably popping off the rode-locker bulkheads I 'glassed there, and definitely scraping off the newly-applied primer paint.

Then Jeremiah in the shop says, 'It better not be scraping off the paint.  It's epoxy.  If they're scraping it off, it wasn't applied right.'  And it was applied right.

End result: Diana arrives across the yard safe and sound.  There was a problem with blocking her, as the guys could not get the strap out from under the keel without blocking the keel bottom in the same place as before-- meaning I still can't scrape, prime and barrier-coat the very bottom.  But I can sort that out another day.  The bulkheads forward were fine (of course).  And the epoxy primer survived very well-- the traces of black wiped off with one hand while I was talking on the phone.  No worries.


In this location the barn part of the shop will block most wet snow.  The weather now comes from off Diana's nose or from slightly to port.  I will have this shrink-wrapped by the end of November (after topcoat on the hull).

The few odd places where the barrier coating was sanded through are the repairs I had to make for the cracks; this is reported elsewhere.  Jerry gave me some leftover stuff so I may not need to go into the quart kit of Pettit Protect that I bought for these (and for the rudder).  The gray cover is because of the instrument holes in the back of the cabin and because the forward edge of the hatch hood is still open (needing woodwork, the last major job to be done to the deck).

On the deck there is a bucket upside-down over the mast step.  The step will be removed for the deck to be painted and then reinstalled with 5200.

The holes forward, where the running lights were mounted, are to be covered with Plexiglas panels, as Diana's eyes (more on this 'secret' later). 

The foredeck hatch is slid open in this picture.  I have to put hinges on it, then remove them, then varnish the whole thing, which, with the boat under shrink-wrap, can easily be done in the shop.


Little Diana likes her new spot in the sun!


In the background can be seen the CY spars rack, welded and bolted to the side of the former storage trailer that is now the lumber-storage room for the shop.  On this rack are C44 spars, the ones for Dave's Reliant, and a few others.  Jeremiah puts each up there with the forklift (another operation that has to be seen to be believed).

I prefer six stands, not four (not counting the bow) because it's simple to pull one down to paint the bare spot.  The plywood steps came over from Diana's old place because I used them to fill and fair the old bow damage and will use them now to reinstall the section of toerail, the stem fitting and the anchor roller.  In this photo I have not yet moved the spars and the workbench to the new spot.

The half-gallon of iced tea is Turkey Hill from 7-11-- the very best cold green tea you can get!  :)

* * *

20 June 2014

Finalizing cabin and interior

Here are some pics of recent progress belowdeck.  Currently (June 20th) I am finishing the cabintop, fitting the Dorade boxes and hatch shroud, and remedying the PO's repair of the bow in preparation to paint the hull and fit the stem fitting.


Hanging locker


Aft of the port-side rode locker, opposite of the microwave and toolbox, was planned this locker.  In framing it I realized there was much more space than I expected.  As it is now, it has several bins to hold shoes, balled-up t-shirts and cottons, various personal effects as well as 12" worth of clothes on hangers.  Shirts and coats will fold onto the floor; but it's much better than having nowhere to hang clean clothes at all.

The first photo shows the after bulkhead, where the plumbing is (which necessitated the locker being delineated from the bunk space in the first instance).  The 1-1/2" vented loop is for the holding-tank pumpout; the smaller standpipe is the holding-tank vent which goes to a 3/4" through-hull in the hull.  The wiring will go to a 3-gang panel over the head sink for the lights.  The little 1-1/4" elbow shown coming through the wall is the head-sink drain, going to its trap and thence to 3/4" hose for the seacock.


I don't know if I've said this before but, when fitting plumbing traps to boat sinks, one should always make them turn forward or aft first and then inboard only after they have gone downwards, to ensure sufficient drainage on either tack.  (This says nothing about the shape of the basin which may retain water to leeward of the drain; but that can't be helped unless you have a basin more steeply sloped than the usual angle of heel.)

The other pic shows the forward side of the same locker.  The "Get A Grip' placard came from a hook-and-loop strap display at the West Marine store where I worked; I thought it was hysterical and swiped it from the trash when the sale was over and cut it to a minimal size (and then spilled acetone on it, causing the blur).  It's been in the boat for about 6 years and by now deserves a place as decor.


This locker will get covered with a canvas curtain to keep water out, as the foredeck hatch is directly overhead.

The vertical door-jamb pieces probably need some cleaner way of terminating outboard of the sill-- I'll look to that later.


Main cabin, aft


These two pics show the back corners of the main cabin, the electrical panel to port and the galley and bookcase to starboard.  Among other things can be seen my re-use of the (1974) teak fiddle rails that were originally fitted to the outboard hull shelves over the settees.  This wasn't an easy task since the cabin, as molded, is not symmetrical-- the port-side bulkhead was fully one inch wider than the starboard side, as is evident since the vertical posts are keyed to the hatch's opening.  The solution lay in justifiying the space between two spindles on the center of the opening and then ensuring that no spindles are too close to the ends.  I think one of them is a little off, by less than 1/8", but you won't be able to tell (and one strict rule of Diana is that no one is permitted to visit this boat with a ruler in hand!).


In the spirit of complete disclosure: the cheek piece at the after end of the overhead cabinet (where the radio goes) is teak, not mahogany!  It came from a very weathered piece in a trash bin and I didn't recognize it till I'd sanded it down and applied varnish.  Oh, well-- at least both sides are the same (from the same board in fact).


On neither side is the cap fitted to the top of the divider bulkhead.  I've been getting impatient about getting this stuff varnished and installed, just so it doesn't clutter up the cabin and inhibit other progress (as it's all been doing for too many years) and so I screwed this stuff into place as it is now.  I'll fit the cap pieces after I finish the after side of these bulkheads (more on that-- and a surprise! --later).

I haven't had the motivation to build the drawers for the galley yet and so the cabinet bulkhead beside the ladder is still missing.

I don't go in for the trite little piracy fetish so many yachties favor; but the skull-and-crossed-bones can cooler is in tribute to my late cousin Peter, who co-founded Raider Yacht (for which this was a logo).  So it shall remain on the boat.
  

Other stuff


Here is a cool pic of the foredeck hatch.  It lets in some phenomenal light-- you can read by it in the saloon, even during a rain, even with the other hatch closed.  I've been saying all along that if this project is taking far too long, at least I get to spend my days with gorgeous bits of varnished Honduras mahogany; and here's an example.

The stick holds up the hatch because the hardware isn't on yet.  The cords are what secures it down against wind, rattles and motion.

The green tape is a sign reminding me which end goes forward.  Remember that the hatch frame is cut from the base on the deck, to ensure that they fit together, before the base is installed.  Even with a rectangle it matters which way it goes.


Below is a pic of the (too dusty!) sink in the head.  The cabinet lift-out panels are not painted and so not fitted yet.  The leaning board is the divider, not screwed in, that will hold a shelf in the forward locker.

The portion of counter after of the seam in the fiddle hinges up for access to a 4-inch-deep bin (the original bin over the footwell of the settee berth.  The astute will recall that this idea was my contribution to this boat's design in 1972; see here).


I messed up the trim stick that goes atop the blue countertop along the forward bulkhead and it hasn't been remade and installed yet.  In (typical) impatience I had just "eyeballed" the angle against the fiddle and cut it; and it's too wrong to be tolerable.

I could have tugged the wire loom a little more tightly into the upper shelf, under the window, for this pic; but there's still wiring to be run in it.

Don't say anything about the after cheek piece protruding below the upper fiddle rail while the forward one remains even.  This is an oversight and will be remedied!  The trick deserving the credit is in the making of both cheek pieces, one wide and one narrower, so that they align with the locker face which, which like the sink-counter face, is parallel to the centerline.  How else would it have been done?

And this allows the curtain rods to be fastened to the cheek pieces, more or less parallel horizontally.  My mom, the accomplished seamstress, is currently making the curtains for these hull windows.


Main saloon


Lastly here is a pic of the saloon bulkhead after I fitted the cheek pieces along the top.  This had been long unfinished because I just didn't know a way of making it all in one piece; and then (in the shower, as so often happens) I conceived of the positively brilliant notion of making each side in two pieces.  I wanted some straight line to avoid emphasizing the roundness of the cabintop in here; and here is my solution: an ogee curve descending to a second cheek piece and a further horizontal line.  Together these just about cover the ragged fiberglass tape (though not quite) and represent an apparently-structural deck beam in conjunction with the compression post (the true structural deck beam is on the forward side of the bulkhead, requiring the horizontal door header).


In keeping with the conceit of having these pieces represent a real deck beam, I deliberately made these of Phillipine (lauan), not Honduras; so they appear greyer, darker, a little greener than the footwell trim and table cleat mounted lower on the bulkhead.  The cheek pieces to cover the gap between bulkhead and cabinside will be of (thinner) Honduras.

All of these pieces, as well as those on the forward side of this bulkhead, are "permanently" installed now.  If the white or varnish requires any more touching-up, it'll be done with them in situ.

I should have reinstalled the arched door header here; but in fitting the cheek pieces I ran one screw into the bulkhead, thinking it would be covered by the door header, and just missed; so I have to fill it and paint it again first.

Dave saw this and commented on my practice of simply screwing these pieces into place without concern for hiding the screw heads behind plugs or multiple cleats, saying it was just like what Uncle Joe would have done.  I took that as a high compliment, as I have long admired Uncle Joe's clearheaded sense about what's least complicated being the most aesthetically pleasant... but I really meant it all this way to be able to remove all these pieces for varnishing (and revarnishing.  As I always say, 'It's never the last coat of varnish!').

I have a really cool idea for after I paint the fiberglass around the companionway hatch (where the centerline is indicated, top of photo); but I won't share that till it's been done.  Stay tuned.

* * *

24 May 2014

Diana's new stemhead fitting

I never liked the three-legged Hunter 25 pulpit and meant to replace it with something cooler from the very start.  This would mean cutting off the 7/8" stainless-steel stud from the stemhead fitting and polishing it over; but as Diana's PO had put her into some kind of close encounter with a piling, the original stemhead fitting was quite mangled and badly restraightened.  So I determined to make a new one.

I designed a very nice replacement part for this but found no one to make it at a reasonable price.  Then I happened to stumble across one on the Racelite web page and ordered it.  Though the dimensions on the site represented an adequate part, the actual thing seemed to represent them only nominally-- the thickness was not a true 1/8" and the length was entirely too short.  Rather typically I sat on this problem for over a year, working on other things, while I contemplated some solution.

Finally I ordered some flat stock, cut it to length, and sent it out to the local welders' with a pattern of the correct angle.  The part I received was simply beautiful.  I have begun to polish it and will finish it off before it's permanently installed.


You can see how the original part was only about 60 percent as long as it needed to be along the stem.  The flat stock welded to the part effectively doubles the thickness for the first three holes.  It is true that the tang for the forestay is still of the thin (original) stock; but as it's already thicker than were the shroud tangs I'll install it as it is and see if, as the rig is tuned, I get any elongation of the hole.  If that will be the case (which I doubt) I'll have it remedied with more welding.  As this Racelite part is meant for 20-to'22-footers, and as it's already meant to carry the load of 1/4" clevis pins, I'm betting it won't ever be a problem.


In this pic I have set the part on the bow to check the fit.  Thanks to my template the welder's work resulted in a perfect fit. You will see the gap behind the very top of the fitting-- this requires attention.  If I were to mount this as-is, two things would happen: Diana's J measurement (foot of the headsail) would be longer than that of a stock Hunter 25 by about 7/8"; and the natural stresses of a tuned and ruggedly-used rig would attempt to bend the fitting aftwards, putting the single screw through the deck into a shear load, and some distortion would occur.  This is why it is never wise to suspend rigging attachments over air, as would be done here.  I will fabricate a little block for in this gap, just something to support the compression load, and 'glass or epoxy it into place prior to paint and prior to attaching this fitting.

The horizontal pencil lines are marking where the mounting holes will go.  Only one of the original holes lined up.  I have a mahogany backing block for this, to be bedded in 5200 inside, and will drill new holes for the 1/4-20 hex-head cap screws.  Hex-heads are best for this sort of thing because you can put a ratchet and socket on each one and really tune them well.  Large-scale Phillips and, worse, slotted-head screws are really kind of pointless after a while.  A larger screw implies a larger load which means installation torque matters more.  No one can apply appropriate torque with a screwdriver handle.  I think the only reason people dislike hex-headed cap screws is because they make the boat look like Frankenstein's monster.  Personally, I like the look.  It's its own aesthetic.

The evident damage to the bow was from the PO.  The starboard-side toerail was cut to facilitate the fiberglass repair and reattached.  Coincidentally, this piece will have to be cut down to accommodate the anchor roller.  I'll fill the seam in the toerail with black 4000-UV to minimize the appearance of a crack.  Much of the old fiberglass repair was faired over with 3M filler (the grayer stuff).  The darker brown-olive is raw fiberglass from my sanding.  I have filled all the imperfections with both Evercoat 27 and epoxy and after painting with epoxy paint (Perfection or Brightside) this won't be visible or vulnerable.

The brown thing above the deck is the work-order tag from the welders'.  Mistakenly they wrote it up as being for my cousin Dave's shop; but this was my project and I contracted and paid for it.  (This happens a lot, actually.)

Sales pitch #1

If any other H25 owner is interested in having one of these parts, I will be happy to supply it.  It does, however, require a 4-legged pulpit; though I'd consider that an improvement.  I've designed an updated bow rail for Diana, along the lines of a J27's, complete with step-through end, varnished-mahogany seat/step with nonskid, and mount for Aqua Signal running light; though I'll be installing a plain-Jane castoff pulpit from another boat for the short term.

Sales pitch #2

Yes; the boat beside Diana, evident in one of these pics, is one of her sisters-- in this case a fellow February 1974 boat, this one the later trunk cabin/pop-top model.  They are both of the same series, Diana being number 027 and the other boat being 140.  At that time Hunter had two production lines of H25s at their Marlboro, New Jersey, plant; and I believe that the "0" signified the period's production series of "blister-canopy" or "flush-deck" models and the "1" signified the trunk-cabin models. If these boats were not on the production floor at the same time, they are probably not more than two weeks apart in age.

I have been referring to this other boat as "the sweet sister" and  hope to enter negotiations with her owner to take over her care and to restore her-- for she is still, even with an inadequate cover, in better condition than Diana was when I first found her and would represent a pretty easy, quick and profitable "quick fix" and resale.  She'll need some deck-core repair, paint, new cushions and upholstery, lifelines and probably cordage; and I do not know if there is an engine available.  But it wouldn't take much more than that for her to go sailing again.  As soon as Diana goes in I will have this boat shrink-wrapped and set a dehumidifier in her, to help preserve her.  Anyone interested is welcome to get in touch.

* * *


19 December 2012

Visit from Santa Claus!


The Cherubini boat shop was graced with a visit from our very own Santa Claus on Friday, 14 December 2012.  This is James Turrell, noted artist and new owner of C48 hull no.8, Amazing Grace, now renamed (after Mr Tyrell's ouevre of choice) Light Reign.  Pictured (in front of one of the former Atlantic City billboards that Dave acquires for use as heavy-duty covers, dropclothes and curtains) are me, Mr Tyrell, Lee, Steve and Dave.  Photo taken by C. Michael Lawrence.

Happy Christmas to all!

26 October 2011

It's not my fault!

Re: pics from September 2011

   The first thing one has to consider in viewing evidence of my progress so far is that the boat was in pretty sad shape to start with in 2003.  Most of what there was of it fit into one of three categories:
   1. bits that were worn-out, too old or damaged from age
   2. bits that were badly maintained by POs
   3. bits that were badly done by Hunter or my dad in the build and design stages and desperately called out for some revisionist thinking.

   Enter an idealistic dreamer (read that: 'idiot') with more thought than power and definitely more enthusiasm than money or resources.

   The second thing one has to consider is that my employment record has been spotty (at best) since I got this boat.  The good bit is that had I not had a steady job as a classroom teacher at the time I bought it, I never would have got the boat later (and I would have been boatless and poor Diana would have been scrapped).  The bad bit is that, after a year of having the boat located 50 miles away, my cousin Dave took over the old CBC property and offered me a spot there, gratis (basically he 'ordered' me to bring the boat up here and get it done); but then I lost my teaching job due to a budget cut (what else?) six months later and have not worked steadily since.

  So Diana appeared in a window of time that was as narrow as her transom and was (and remains) never to be repeated.  Luck is as luck does.  At least I have a boat-- and despite how it looks it really isn't that far away from sailing salt water again at all.  Most of the delay has been due to my nitpicking-- in the process of too many years I have rebuilt about 75% of the original boat and another 10% or 15% from now it'll be done.  I do what I can, when I can, with what I have.  What else is there?

* * *